Ppp Best Quotes

We've searched our database for all the quotes and captions related to Ppp Best. Here they are! All 2 of them:

We need the implementation of the Smart Waterways Grid across India to harness 1,500 BCM of floodwater and connect the rivers and catchment areas as a single plane. The grid will receive 1,500 BCM of floodwater and act as a water grid so that water can be released to any deficient place and replenished during flood. It would act as a 15,000 kilometres-long national reservoir. It would be able to provide drinking water to 600 million people, irrigation to 150 million acres of land, and generate 60,000 MW of power. Due to ground water recharge, it would also save 4,000 MW of power. Each state can implement this mission with an outlay of approximately 50,000 crores with annual budgetary support, central government assistance, public-private consortia and with support from the World Bank in a BOOT (Build, Operate, Own and Transfer) based PPP model and this can be realized within 2020. Apart from this, an Integrated Water Resource Management system is also required to revive water bodies and tanks and build farm ponds and checkdams across India as well as increase irrigation infrastructure and groundwater potential, thereby enhancing the safe drinking water resources of the nation.
A.P.J. Abdul Kalam (The Righteous Life: The Very Best of A.P.J. Abdul Kalam)
The Pseudocode Programming Process Have you checked that the prerequisites have been satisfied? Have you defined the problem that the class will solve? Is the high-level design clear enough to give the class and each of its routines a good name? Have you thought about how to test the class and each of its routines? Have you thought about efficiency mainly in terms of stable interfaces and readable implementations or mainly in terms of meeting resource and speed budgets? Have you checked the standard libraries and other code libraries for applicable routines or components? Have you checked reference books for helpful algorithms? Have you designed each routine by using detailed pseudocode? Have you mentally checked the pseudocode? Is it easy to understand? Have you paid attention to warnings that would send you back to design (use of global data, operations that seem better suited to another class or another routine, and so on)? Did you translate the pseudocode to code accurately? Did you apply the PPP recursively, breaking routines into smaller routines when needed? Did you document assumptions as you made them? Did you remove comments that turned out to be redundant? Have you chosen the best of several iterations, rather than merely stopping after your first iteration? Do you thoroughly understand your code? Is it easy to understand?
Steve McConnell (Code Complete)