Excavator Operator Quotes

We've searched our database for all the quotes and captions related to Excavator Operator. Here they are! All 8 of them:

I don't want to read your walls ... I don't want to read your hang-ups. I don't want to read skeletal concepts of people who operate without the influence of a limbic system. You are not an archaeologist excavating and presenting old bones. Your work is the connective tissue. Give me some DNA, or don't bother.
Riley Redgate (Final Draft)
Excavator Magnet ELECTRO FLUX Excavator magnet Manufacturers mounting arrangement overcomes the problem which can work in any open yards were the overhead cranes cannot be used. Excavator magnet Manufacturers gives the crane operator completes control of the magnet in various positions, permitting the crane operator to incline or tilt the magnet. The mounting fixture for an electromagnet is further permits the excavator operator to operate the magnet more efficiently by preventing the magnet from swinging freely at the end of the lift crane boom.
Excavator Magnet
I frequently detect a hint of satisfaction in the accounts that manage to excavate moral and individual responsibility from the historical debris. Perhaps it is because of the unspoken belief that changing the people will change the outcome. 'No Hitler, no Holocaust.' If only a few individuals had resolved that it was unconscionable to be a bystander, then perhaps thousands would have been saved. I suppose there is some solace in recovering a history in which altering an isolated event transforms all that follows. But personalizing the story in this way can obscure how these were not isolated individuals operating on their own but rather were people situated in an organizational and historical context that profoundly shaped how they looked upon the world, what they believed they could do, and what they wanted to do. The UN staff and diplomats in New York, in the main, were highly decent, hard-working, and honorable individuals who believed that they were acting properly when they decided not to try to put an end to genocide. It is this history that stays with me.
Michael Barnett
These people have to be brutally cynical in order to do their job, since their job is based on cheating, humiliating and impoverishing countless communities. Cynicism is not an easy burden to carry, and demands of those who bear it an unshakeable self-image of the winner, the invincible Übermensch. The cynical loser is subject to extreme danger. This hints at one possible explanation for why bankers are killing themselves – the occasional moment of self-awareness, revealing the yawning abyss that they have been excavating inside themselves while operating in a kind of moral vacuum.
Anonymous
There’s a way of triumphant accomplishment that comes from lowering dead or unwanted trees. (Not to say the joys of yelling, But that feeling fades pretty quickly once you look down and see unsightly—and very stubborn—Stump milling. If you hire a landscaper or arborist to chop down the trees, they typically leave the stumps behind, unless you pay a further fee. Stump-removal prices vary widely across the country and are supported by the diameter of the stump, but it typically costs between $100 and $200 to get rid of a stump that’s 24 inches in diameter or smaller. And that’s a good price if you’ve only got one stump to get rid of . But, if you've got two or more stumps, you'll save a substantial amount of cash by renting a stump grinder. A gas-powered stump grinder rents for about $100 per day, counting on the dimensions of the machine. And if you share the rental expense with one or two stump-plagued neighbors, renting is certainly the more economical thanks to going. you will need a vehicle with a trailer hitch to tow the machine, which weighs about 1,000 pounds. Or, for a nominal fee, most rental dealers will drop off and devour the grinder. To remove the 30-in.-dia. scarlet maple stump, I rented a Vermeer Model SC252 stump grinder. it's a strong 25-hp engine and 16-in.-dia. cutting wheel that's studded with 16 forged-steel teeth. this is often a loud, powerful machine with a classy mechanism , but it's surprisingly simple to work . But, before you crank up the motor and begin grinding away, it’s important to prep the world for the stumpectomy. Start by ensuring all kids and pets are indoors, or if they’re outdoors, keep them well faraway from the world and under constant adult supervision. Then, use a round-point shovel or garden mattock to get rid of any rocks from round the base of the stump [1]. this is often important because if the spinning cutting wheel hits a rock, it can shoot out sort of a missile and cause serious injury. Plus, rocks can dull or damage the teeth on the cutting wheel, which are expensive to exchange. Next, check the peak of the stump. If it’s protruding out of the bottom quite 6 inches approximately, use a sequence saw to trim it as on the brink of the bottom as possible [2]. While this step isn’t absolutely necessary, it'll prevent quite little bit of time because removing 6 inches of the Stump grinding with a chainsaw is far quicker than using the grinder. After donning the acceptable safety gear, start the grinder and drive it to within 3 feet of the stump. Use the hydraulic lever to boost the cutting wheel until it’s a couple of inches above the stump. Slowly drive the machine forward to position the wheel directly over the stump's front edge [3]. Engage the facility lever to start out the wheel spinning, then slowly lower it about 3 in. in to the stump grinding. Next, use the hydraulic lever to slowly swing the wheel from side to side to filter out all the wood within the cutting range. Then, raise the wheel, advance the machine forward a couple of inches, and repeat the method. While operating the machine, always stand at the instrument panel, which is found near the rear of the machine and well faraway from the cutting wheel. Little by little, continue grinding and advancing your way through to the opposite side of the stump. Raise the cutting wheel, shift into reverse, and return to the starting spot. Repeat the grinding process until the surface of the Stump removal is a minimum of 4 in. below the extent of the encompassing ground. At now, you'll drive the grinder off to at least one side, far away from the excavated hole. Now, discover all the wood chips and fill the crater with screened topsoil [4]. (The wood chips are often used as mulch in flowerbeds and around trees and shrubs.) Lightly rake the soil, opened up a good layer of grass seed, then rake the seeds into the soil [5]. Water the world and canopy the seeds with mulch hay.
Stump Grinding
From ‘Kokor Hekkus the Killing Machine’, Chapter IV of The Demon Princes, by Caril Carphen (Elucidarian Press, New Wexford, Aloysius, Vega): If Malagate the Woe can be characterized by the single word ‘grim’ and Howard Alan Treesong by ‘incomprehensible’, then Lens Larque, Viole Falushe and Kokor Hekkus all lay claim to the word ‘fantastic’. Which one exceeds the other two in ‘fantasy’? It is an amusing if profitless speculation. Consider Viole Falushe’s Palace of Love, Lens Larque’s monument, the vast and incredible outrages Kokor Hekkus has visited upon humanity: such extravagances are impossible to comprehend, let alone compare. It is fair to say, however, that Kokor Hekkus has captured the popular imagination with his grotesque and eerie humor. Let us listen to what he has to say in an abstract from the famous telephoned address, The Theory and Practice of Terror, to the students of Cervantes University: “… To produce the maximum effect, one must identify and intensify those basic dreads already existing within the subject. It is a mistake to regard the fear of death as the most extreme fear. I find a dozen other types to be more poignant, such as: The fear of inability to protect a cherished dependent. The fear of disesteem. The fear of noisome contact. The fear of being made afraid. “My goal is to produce a ‘nightmare’ quality of fright, and to maintain it over an appreciable duration. A nightmare is the result of the under-mind exploring its most sensitive areas, and so serves as an index for the operator. Once an apparently sensitive area is located the operator to the best of his ingenuity employs means to emphasize, to dramatize this fear, then augment it by orders of magnitude. If the subject fears heights, the operator takes him to the base of a tall cliff, attaches him to a slender, obviously fragile or frayed cord and slowly raises him up the face of the cliff, not too far and not too close to the face. Scale must be emphasized, together with the tantalizing but infeasible possibility of clinging to the vertical surface. The lifting mechanism should be arranged to falter and jerk. To intensify claustrophobic dread the subject is conveyed into a pit or excavation, inserted head-foremost into a narrow and constricted tunnel which slants downward, and occasionally changes direction by sharp and cramping angles. Whereupon the pit or excavation is filled and subject must proceed ahead, for the most part in a downward direction.
Jack Vance (Demon Princes (Demon Princes #1-5))
Diving operations on the Nevada began in mid-December as a joint effort with units in Pearl Harbor who had divers attached. Divers from submarine rescue vessels Widgeon and Ortolan excavated mud from under the stern and dynamited and removed sections of her bilge keel in an effort to attach a large patch over the forty-eight-foot-long, twenty-five-foot-high torpedo hole. The patch was made by the shipyard, and the bottom of the Oklahoma was used as a pattern because she was a sister ship of the Nevada. The divers from the Widgeon and Ortolan tried to secure the patch for more than a month before a halt was called to the work. After the Nevada was dry-docked, it was discovered that the torpedo blister on the side had blown outboard about two feet, which explained why the patch would not fit. Eventually, the patch was aborted and diving efforts were concentrated on isolating and making watertight all interior bulkheads contiguous to the hole. This required closing watertight doors and fittings, welding or caulking split seams, and driving wooden plugs in small holes. Our crew from the Salvage Unit was assigned this work. At the same time, Pacific Bridge civilian divers fitted and secured wood patches over bomb holes in the Nevada’s outside hull.
Edward C. Raymer (Descent into Darkness: Pearl Harbor, 1941—A Navy Diver's Memoir)
In all over 400 dives were made on Nevada totaling over 1500 diving hours. The divers performed all manner of work from underwater cutting with oxy-hydrogen and electric torches to hydraulic and syphon excavating, to using dynamite to remove sections of the docking keel, to the use of hand and pneumatic tools for drilling and setting patches. They also did much interior work for pumping operations, adjusting watertight closures, etc. The successful accomplishment of all assigned diving tasks without casualty or injury was the result of excellent supervision on the part of Lieutenant Commander H. E. Haynes, who was in general charge of all diving, plus Gunner Duckworth of Widgeon, Gunner Arnold Larson of Ortolan, and Carpenter Mahan of the Salvage Division.
Homer N. Wallin (Why, How, Fleet Salvage And Final Appraisal [Illustrated Edition])