“
Back in 2016, when Build, Build, Build was just starting, a lot of people had doubts. One friend looked me in the eye and said, “This was another campaign promise meant to be broken.” We were likened to ardent suitors prepared to say anything.
We could not blame them. At that time, it did seem impossible. Traffic in Metro Manila was costing us ₱3.5 billion a day. EDSA has exceeded its capacity by over a hundred thousand vehicles. Government projects were delayed for years — with some projects implemented only after several decades. But while we were all very familiar with this reality, it was not a reality we were prepared to accept. The Philippines was far from its full potential. To many of us, it was a chance to realize a dream. It was a chance to shape history and usher in the Golden Age of Infrastructure.” - Anna Mae Yu Lamentillo , Night Owl: A Nationbuilder’s Manual 2nd Edition (p. 112, Build, Build, Build Projects CAR Region)
”
”